Zeebrugge 26 August 2007 |
Zeebrugge 09/02/08 | Zeebrugge 09/02/08 | Westerschelde 05/07/20 |
Name |
TAIPAN |
Previous names |
2006 - 2006 Morning Countess |
Type |
Roll-On/Roll-Off carrier - Vehicles Carrier PCTC - Pure Car and Truck Carrier |
IMO-number |
9311866 |
Call sign |
6CVF2 |
Flag |
Bahamas |
Port of registry |
Nassau |
GT |
57.692 t |
DWT |
Summer: 21.021 t |
NT |
21.037 t |
Length |
199,99 m overall 188,30 m between perpendiculars |
Breadth |
32,27 m extreme |
Draught |
Summer: 10,02 m |
Air draft |
46,00 m |
Freeboard |
22.640 mm |
Depth |
32,64 m to upperdeck |
Speed |
21,0 knots |
Built |
2006 |
Keel laid |
15/03/2006 |
Launch |
03/11/2006 |
Date of completion |
19/12/2006 |
Builder |
Stocznia Gdynia S.A. Group Gdynia ul. Czechoslowacka 3 81-963 Gdynia Poland |
Yard number |
8168/15 |
Hull material |
Steel |
Hull type |
Single hull |
Main engine |
1x MAN-B&W/Cegielski 7S60MC-C - 7 cylinder combustion engine 15.828 kW at 105,0 rpm |
Propellers |
1x Mono-block propeller |
Boilers |
1x Exhaust gas water tube AV-7 1x Vertical shell type Mission OS Builder: Aalborg Industries A/S |
Generators |
3x MAN-B&W 7L28/32H main diesel generatorsets total output of 4.400 kW |
Emergency |
1x MAN D2866LXE30 diesel generatorset |
Bow thruster |
1.400 kW |
Capacity car units (RT43) |
6.400 1 RT43 unit = 7,38975 m² |
Car deck areas |
Total: 54.900 m² Hoistable: 17.000 m² |
Stern ramp width |
Width: 7,00 m Capacity: 150 t |
Number of decks |
13 (of which 4 are hoistable) |
Tank capacities |
Ballast: 7.757 m³ Fuel oil: 3.350 m³ Diesel oil: 130 m³ Lub oil: 150 m³ Potable water: 260 m³ |
Anchor chain |
Length: 660,00 m Diameter: 78 mm |
Lifting equipment |
1x Crane - SWL 5,0 t |
Basic complement |
27 |
Manager |
Stamco Ship Management Company Ltd. 21 Akti Miaouli Street 185 35 Piraeus Greece |
Operator |
WWL - Wilh. Wilhelmsen Lines Group |
Shipping company |
Wallenius Wilhelmsen (WW) |
Registered owner |
Taipan Maritime Limited C/o Ray Car Carriers Ltd. 4th Floor - 1,Circular Road Douglas Isle of Man United Kingdom |
Latest data adjustments |
11 September 2020 |