Name
|
GLOVIS CONDOR
|
Previous names
|
2011 - 08/2013 STX Dove
|
Type
|
Roll-On/Roll-Off carrier - Vehicle carrier
|
IMO-number
|
9414876
|
Call sign
|
V7VI4
|
Flag
|
Marshall islands
|
Port of registry
|
Majuro
|
GT
|
60.396 t
|
DWT
|
22.351 t
|
NT
|
27.079 t
|
Length
|
199,10 m overall
|
Breadth
|
32,36 m
|
Draught
|
Summer: 11,22 m
|
Reg. Dimensions L x B x D
|
192,89 x 32,26 x 19,65 m
|
Rule Dimensions L x B x D
|
190,50 x 32,26 x 14,30 m
|
Freeboard
|
3.115 mm
|
Depth
|
14,30 m
|
Speed
|
20,4 knots
|
Built
|
2011
|
Keel laid
|
22/12/2008
|
Launch date
|
05/07/2010
|
Date of completion
|
20/01/2011
|
Builder
|
STX Dalian Shipbuilding Co., Ltd.
Dalian China
|
Yard number
|
D-1002
|
Hull material
|
Steel
|
Watertight bulkheads
|
Transverse: 4
|
Number of decks
|
7
|
Main engine
|
1x MAN B&W 6S60MC-C - 2 stroke single acting 6 cylinder 600 x 2.400 mm diesel engine 14.280 kW at 105,0 rpm
Builder: STX Heavy Industries Co., Ltd., Changwon - South Korea
|
Propellers
|
1
|
Boilers
|
1x Auxiliary water tube boiler
Pressure: 8,8 kg/cm²
Heating surface: 76,2 m²
2x Economizer exhaust gas boiler
Pressure: 11,8 kg/cm²
Heating surface: 394 m²
Built: 08/2009
Kangrim Heavy Industrial Co., Ltd.,Changwon - South Korea
|
Generators
|
3x Generators 1.625 kVA / 450 Volt
|
Number of cars
|
6.700
|
Tank capacities
|
Fuel oil: 3.842,5 m³
Fresh water: 256,7 m³
Water ballast: 9.126,6 m³
|
Crew
|
24
|
Manager
|
Hyundai Glovis Co., Ltd.
|
Technical manager
|
G-Marine Service Co., Ltd.
|
Owner
|
GL Condor Shipping, Inc. Marshall islands
|
Latest data adjustment
|
30 August 2018
|