Westerschelde 27 August 2015 |
Name |
MSC LEVINA |
Previous names |
02/1989 – 04/1998 Hanjin Le Havre |
Type |
Cellular containership |
IMO-number |
8608200 |
Call sign |
3FJR8 |
Flag |
Republic of Panama |
Port of registry |
Panama City |
GT |
36.420 t |
DWT |
43.140 t |
NT |
12.858 t |
Number of 20ft containers |
2.932 |
Container capacity 14t |
2.450 |
Reefer capacity |
153 |
Length |
241,32 m overall |
Breadth |
32,21 m overall |
Draught |
Summer: 11,71 m |
Depth |
19,00 m |
Speed |
Max: 22,5 knots Service: 21,7 knots |
Built |
1989 |
Keel laid |
06/09/1988 |
Launch date |
25/02/1989 |
Delivery date |
14/04/1989 |
Builder |
Samsung Shipbuilding & Heavy Industries Co. Ltd. Geoje South Korea |
Yard number |
1063 |
Hull material |
Steel |
Continuous decks |
1 |
Main engine |
1x Sulzer 7RTA84 – 7 cylinder combustion engine 23.168 kW / 31.502 hp |
Propellers |
1 |
Generators |
3x MAN-B&W 6S28LH main diesel generatorsets each 1.250 kW |
Cargo gear |
Gearless |
Owner |
MSC Shipmanagement Hong Kong Hong Kong China |
Scrapped |
20/10/2023 Beached at Alang – India Shipbreaker : Bharat Shipbreakers Corp. |
Latest data adjustment |
28 April 2024 |