Zeebrugge 26 May 2005 |
Zeebrugge 24/04/05 |
Name |
C2C LUPUS |
Previous names |
2005-30.06.2005 Lupus J |
Type |
Cellular Containership |
IMO-number |
9328625 |
Call sign |
V2PR4 |
Flag |
Antigua & Barbuda |
Port of registry |
St John's |
GT |
6.901 t |
DWT |
Summer: 9.218 t |
NT |
3.375 t |
Number of 20ft containers |
Hold: 204 Total: 750 |
Container cap. at 14t |
450 |
Reefer capacity |
170 |
Length |
139,81 m overall |
Breadth |
19,70 m overall |
Draught |
Summer: 7,29 m |
Depth to main deck |
9,45 m moulded |
Speed |
17,0 knots |
Built |
2005 |
Keel laid |
19.07.2004 |
Launch date |
14.01.2005 |
Date of completion |
15.03.2005 |
First movement |
19.03.2005 |
Builder |
Detlef Hegemann Rolandwerft GmbH & Co. KG |
Yard number |
222 |
Hull material |
Shipbuilding steel (standard) |
Hull type |
Single hull Double bottom |
Watertight bulkheads |
9 |
Continuous decks |
1 |
Main engine |
1x MaK 8 M 43 - 4 stroke single acting 8 cylinder430 x 610 mm diesel engine - 7.200 kW at 500 rpm |
Propeller |
1x Controllable pitch propeller - aft |
Boilers |
2x Steam boiler, oil fired / exhaust gas heated - 9,0 bar |
Electric installations |
1x Plant 440/230 V - 1.076 kVA |
Shaft generator |
1x 1.200 kW / 1.495 kVA |
Generators |
2x Main diesel generatorsets each 538 kVA / 430 kW |
Emergency + harbour gen. |
1x Diesel generatorset 500 kVA |
Batteries |
4x Batteries for Start emergency engine each 180 Ah |
Compressed air receivers |
2x Receivers each 750 litres - 30,0 bar |
Bow thruster |
1x Transverse thruster - 1.000 kW, forward |
Tank capacities |
Fuel oil: 570 m³ |
Largest hatch |
Length: 28,95 m |
Anchor equipment |
3x Anchors weight each 4.320 kg |
Cargo gear |
Gearless |
Crew size |
19 |
Manager |
Jüngerhans Maritime Services GmbH & Co. KG |
Shipping company |
Jüngerhans |
Owner |
JMS Thirty-Second Shipping Co. Ltd |
Renamed |
09.07.2007 C2C Astralis |