Antwerpen 20 May 2011 |
Antwerpen 16/04/14 | Antwerpen 07/05/15 | Antwerpen 23/05/19 | Antwerpen 23/05/19 | |||
Name |
DE NEUS |
Type |
Grab dredger Multi purpose barge |
ENI-number |
06105203 |
Call sign |
OT3678 |
GT |
1.058 t |
Flag |
Belgium |
Port of registry |
Antwerpen |
Length |
53,00 m |
Breadth |
19,00 m |
Draught |
2,40 m |
Depth |
3,50 m |
Built |
2004 |
Delivery date |
19.02.2004 |
Builder |
Shipyard De Donge Portugalweg 3 (industrieterrein "Vlissingen-Oost", havennr 5910) 4455 TZ Nieuwdorp The Netherlands |
Yard number |
04914 |
Hull material |
Steel |
Continuous decks |
1 |
Main engine |
1x ABC type 6 DZC-750 - 4 stroke 6 cylinder 256 x 310 mm diesel engine - 1.075 kW / 1.461 hp at 750 rpm Built: 2003 |
Propelling system |
2x Azimuth thruster solid |
Shaft generator |
1x 150 kVA - 120 kW |
Generators |
1x Diesel generatorset 150 kVA - 120 kW - 183 hp 1x Diesel generatorset 40 kVA - 32 kW - 56 hp |
Dredger crane |
1x Type S880.35E Balance Crane – supplied by French builder Seram, it weighs nearly 300 t and is the largest of its type ever built by the firm Dredging depth: 22,00 m Max. reach: 35,00 m Operating reach: 25,00 m Lifting capacity at 25 m: 35,2 t Clamshell bucket volume: 15 m³ Manufacturer: Seram Group 259 Rue Eugène Bourdon 6600 Perpignan France |
Spuds |
3x Each 24,00 m long, which means De Neus doesn’t need to anchor while dredging, causing minimal obstruction to port vessel traffic |
Spud winches |
Mounted below deck in three separate winch rooms, avoiding the need to have cumbersome (and potentially dangerous) cables on deck |
Dredging instrumentation |
Supplied by Seatools and giving De Neus centimetre dredging accuracy |
Manager |
Antwerp Port Authority |
Owner |
Gemeentelijk Havenbedrijf Antwerpen Antwerp Port Authority |
Remarks |
Self-propelled |