Spijkenisse, The Netherlands 09 September 2014 |
Name |
AL BAHAR C/D HUTA 12 |
Previous names |
2014 Launch as: Huta 12 |
Type |
Cutter suction dredger |
IMO-number |
9686285 |
Call sign |
HZ0699 |
Flag |
Saudi Arabia |
Port of registry |
Jeddah |
GT |
5.670 t |
DWT |
Summer: 2.000 t |
NT |
1.701 t |
Length |
122,50 m overall 102,00 m between perpendiculars |
Breadth |
21,70 m |
Draught |
5,00 m |
Freeboard |
1.810 mm |
Depth |
6,80 m |
Speed |
9,0 knots |
Built |
2014 |
Keel laid |
14.08.2013 |
Launch date |
08.03.2014 |
Date of completion |
22.10.2014 |
Builder |
IHC Beaver Dredgers BV |
Yard number |
02800 |
Hull material |
Steel |
Watertight compartments |
14 |
Continuous decks |
1 |
Main engine |
2x MAN B&W 48/60CR - 4 stroke 9 cylinder 480 x 600 mm diesel engines - each 3.180 kW / 4.320 hp at 500 rpm Built: 2013 |
Propelling type |
2x Electrical 1.590 kW at 1.000 rpm Builder: AEM - Anhaltische Elektromotorenwerk Dessau GmbH |
Propelling system |
2x ZF Marine ZF AT-7000 Azimuth stern drive propellers - aft at 255 rpm 4 blades - diameter: 2.200 mm
|
Shaft generator |
4x Main diesel generatorsets each 5.288 kVA - 4.230 kW |
Generators |
1x Main diesel generatorset 1.500 kVA - 1.200 kW - 1.708 hp |
Emergency generator |
1x Diesel generatorset 850 kVA - 680 kW - 924 hp |
Total installed power |
23.545 kW |
Cutter power |
3.500 kW |
Sand pump output |
10.600 kW |
Suction pipe |
1x 900 mm |
Dredging depth |
28,00 m |
Spud pole |
2 |
Fuel capacity |
1.134,36 m³ |
Anchors |
4 |
Deck cranes |
1x SHF Cranes 311 Gantry Crane - SWL 30 ton at 21,00 m |
Manager |
Huta Marine Works |
Registered owner |
Huta Marine Works |
Latest data adjustment |
12 December 2014 |