Vlissingen 24 October 2019 |
Name |
PYXIS PIONEER |
Type |
VLGC - Very large gas carrier / LPG tanker |
IMO-number |
9792747 |
Call sign |
9V8190 |
Flag |
Republic of Singapore |
Port of registry |
Singapore City |
GT |
47.236 t |
DWT |
53.928 t |
NT |
14.171 t |
Length |
229,90 m overall |
Breadth |
37,20 m |
Draught |
Summer: 11,23 m |
Moulded L x B x D |
226,00 x 37,20 x 21,00 m |
Registered L x B x D |
226,00 x 37,20 x 21,00 m |
Freeboard |
Summer: 9.818 mm |
Depth |
21,00 m moulded |
Speed |
16,8 knots |
Built |
2019 |
Keel laid |
07/12/2015 |
Launch date |
28/11/2018 |
Date of completion |
23/04/2019 |
Builder |
Kawasaki Heavy Industries Ltd. Ship & Offshore Structure Company Sakaide Shipyard Japan |
Yard number |
1737 |
Hull material |
Steel |
Hull type |
Double hull |
Main engine |
1x Kawasaki/MAN B&W 7S60ME-C8.2 - 2 stroke single acting 7 cylinder 600 x 2.400 mm combustion engine Mcr 13.100 kW at 89,0 rpm Manufacturer: Kawasaki Heavy Industries, Ltd. Ship & Offshore Structure Company Kobe Shipyard |
Propeller shaft |
1x Oil lubrication shaft with monitoring device Diameter: 630 mm |
Propellers |
1x Fixed pitch propeller |
Boilers |
1x Auxiliary vertical boiler - 0,80 MPa Evaporation: 4,83 t/h Manufacturer: Alfa Laval Qingdao Ltd. |
Generators |
4x Generatorsets total 4.230 kVA |
Cargo tank capacity |
Liquid: 82.391,22 m³ |
Scrubbers |
Scrubbers at the exhaust gas outlets of the main engine and the power generator |
Maximum pressure |
0,025 MPa |
Minimum temperature |
-46°C |
Tank capacities |
Fuel oil: 3.163,40 m³ Fresh water: 400,50 m³ |
Crew size |
29 |
Commerical manager |
Kumiai Navigation Pte Ltd. 27-62, One Raffles Place, 1, Raffles Place Singapore 048616 Republic Singapore |
ISM manager |
Anglo-Eastern Ship Management 16-02, Southpoint, 200, Cantonment Road Singapore 089763 Republic of Singapore |
Registered owner |
Kumiai Navigation Pte Ltd. 27-62, One Raffles Place, 1, Raffles Place Singapore 048616 Republic Singapore |
Latest data adjustment |
03 December 2021 |