Westerschelde 28 february 2020 |
Westerschelde 28/02/20 | Westerschelde 25/10/19 | Westerschelde 25/10/19 | Zeebrugge 28/04/14 | Zeebrugge 28/04/14 |
Name |
PHILINE SCHULTE |
Previous names |
1998 - 2002 Tarquin Pride |
Type |
Liquefied gas tanker - LNG-tanker |
IMO-number |
9183570 |
Call sign |
ZIRO6 |
Flag |
Isle of Man |
Previous flag |
1998 - 2002 Republic of Panama |
Port of registry |
Douglas |
GT |
6.051 t |
DWT |
7.878 t |
NT |
2.398 t |
Length |
118,88 m overall 110,75 m between perpendiculars 111,56 m registered |
Breadth |
17,20 m overall |
Draught |
7,735 m |
Keel to masthead |
34,60 m |
Forecastle |
16,61 m |
Poop |
25,58 m |
Freeboard |
1.160 mm |
Depth |
8,90 m |
Speed |
16,0 knots |
Loadline |
Deadweight (maximum assigned): 7.878 t Deadweight (normal ballast): 1.274 t Deadweight (segregated ballast): 2.429 t Deadweight (tropical): 8.126 t Deadweight (winter): 7.535 t Displacement (lightship): 3.711 t Displacement (normal ballast): 4.985 t Displacement (segregated ballast): 5.929 t Displacement (summer): 9.661 t Displacement (tropical): 11.248 t Displacement (winter): 11.839 t Draft (lightship): 2,91 m Draft (normal ballast): 3,78 m Draft (segregated ballast): 4,40 m Draft (summer): 6,70 m Draft (tropical): 7,89 m Draft (winter): 7,56 m Draught aft (normal ballast): 5,45 m Draught fore (normal ballast): 3,39 m Freeboard (lightship): 6,01 m Freeboard (normal ballast): 5,15 m Freeboard (segregated ballast): 4,53 m Freeboard (summer): 2,21 m Freeboard (tropical): 1,01 m Freeboard (winter): 1,34 m FWA (summer draft): 158,0 mm TPC Immersion (summer draft): 17,50 t |
Built |
1998 |
Keel laid |
25/03/1998 |
Launch date |
11/07/1998 |
Date of completed |
30/09/1998 |
Builder |
Hyundai Heavy Ind. Co., Ltd 1, Cheonha-dong, Dong-gu Ulsan 682-792 Republic of Korea |
Yard number |
H-1093 |
Hull material |
Shipbuilding steel (standard) |
Hull type |
Single hull Double sided |
Watertight bulkheads |
4 |
Continuous decks |
1 |
Main engine |
1x MAN-B&W/Hyundai 7S35MC - 2 stroke single acting 7 cylinder 350 x 1.400 mm combustion engine Mcr 4.891 kW / 6.650 hp at 170,0 rpm Year of manufacture: 1998 Manufacturer: Hyundai Heavy Industries Co., Ltd. 1, Jeonha-dong, Dong-Ku Ulsan 682-792 Republic of Korea |
Number of screws |
1x Controllable pitch propeller - aft at 170,0 rpm |
Boilers |
1x Thermal oil heater, oil fired - 13,0 bar Heating surface: 22,2 m² 1x Thermal oil heater, exhaust gas heated - 13,0 bar Heating surface: 89,0 m² Year of manufacture: 1997 Manufacturer: Wiesloch Marine & Industries B.V. Ohmweg 8 3208 KE Spijkenisse The Netherlands |
Electric installation |
1x Plant 440 V - 2.062,50 kVA 1x Plant 440 V - 500 kVA 1x Plant 440 V - 120 kVA |
Shaft generator |
1x 400 kW / 500 kVA |
Generators |
3x Cummins KTA-19-G4 - 4 stroke 6 cylinder 159 x 159 mm diesel engines each 563 kW conneced with generators each 550 kW / 687,50 kVA - 400 Volt |
Emergency generator |
1x Diesel generatorset 120 kVA |
Compressed air receivers |
2x Receivers each 5.000 litres - 30,0 bar 1x Receiver 1.000 litres - 7,0 bar |
Bow thruster |
1x Fixed pitch thruster 394 kW / 536 bhp; forward |
Number of cargo tanks |
2 |
Cargo capacity |
8.606 m³ |
Largest cargo tank |
4.697 m³ |
Number of pumps |
4x Cargo pumps each 260 m³/h |
Tank capacities |
Ballast: 1.502 m³ Bunker: 788 t Fuel oil: 820 m³ |
Lifting equipment |
1x Crane - SWL 2,0 t 1x Crane - SWL 4,0 t |
Anchor Equipment |
3x Anchors weight each 3.300 kg Chain length: 495,00 m Diameter: 46 mm |
Crew size |
17 |
Manager |
Bernhard Schulte Shipmanagement (Isle of Man) Ltd. Belmont Hill Dorchester House Douglas , Isle of Man IM1 4RE United Kingdom |
Owner |
Maughold Shipping Ltd. Thornton House Belmont Hill Douglas , Isle of Man IM1 4RE United Kingdom |
Renamed |
Marianna 28 Indonesia, Jakarta - Call sign: YDDC2 Owner: P.T. Pelayaran Arthasamudera Mandiri Manager: Bernhard Schulte Shipmanagement (Singapore) Pte. Ltd. |
Latest data adjustment |
03 December 2021 |