Westerschelde 27 April 2018 |
Westerschelde 17/04/18 | |
Name |
PEAK BREMEN |
Previous names |
09/20011 - 02/2017 ABIS Bremen |
Type |
Multi-purpose dry cargo ship - Open top Carriage of containers, strengthened for heavy cargo |
IMO-number |
9612533 |
Call sign |
PCJO |
Flag |
The Netherlands |
Port of registry |
Harlingen |
GT |
2.978 t |
DWT |
Summer: 4.052 t Winter: 3.920 t |
NT |
1.384 t |
Displacement |
5.555 t |
Lightship |
1.503 t |
Number of 20ft containers |
214 |
Length |
89,65 m overall 94,95 m between perpendiculars |
Breadth |
14,09 m moulded |
Draught |
Summer: 5,51 m |
Air draft |
30,80 m from keel |
Freeboard |
1.453 mm |
Depth |
6,80 m moulded |
Speed |
Maw: 12,5 knots |
Built |
2011 |
Keel laid |
05/11/2010 |
Launch date |
02/03/2011 |
Delivery date |
06/09/2011 |
Builder casco |
Partner Stocznia Sp.z.o.o. Szczecin (Stettin) Poland Yard number: Y9612533 |
Builder completion |
Shipkits B.V. Harlingen The Netherlands Yard number: 108 |
Hull material |
Steel |
Continuous decks |
1 |
Main engine |
1x MaK 8M20C - 4 stroke single acting 8 cylinder 255 x 400 mm combustion engine 1.520 kW / 2.067 bhp at 1.000 rpm |
Propellers |
1x Controllable pitch propeller |
Bow thruster |
1x 299 kW |
Number of holds |
1x Box 56,00 x 11,00 x 8,25 m |
Cargo hold capacity |
Grain: 5.049 m³ / 178.300 ft³ |
Number of hatches |
1 72,00 x 11,60 m |
Max permitted loads |
Twendecks: 1,5 t/m² Tanktop: 15,0 t/m² Hatches: 1,5 t/m² |
Manager |
Peak Project Carriers A.S. Groningen The Netherlands |
Previous managers |
2011- 2016 Abis Shipping Company B.V., Harlingen - The Netherlands 2016 - 2017 Peak Project Carriers A.S., Nyborg - Norway |
Registered owner |
General Partner Peak Bremen B.V. Groningen The Netherlands |
Previous names & owners |
2011 - 2017 ABIS Bremen - Beheermaatschappij Abis Bremen B.V., Harlingen - The Netherlands |
Latest data adjustment |
03 August 2023 |