Westerschelde 15 July 2019 |
Antwerpen 14/07/19 | Antwerpen 14/07/19 | Brugge 16/11/10 | Brugge 16/11/10 |
Name |
MEKHANIK BRILIN |
Russian name |
МЕХАНИК БРИЛИН |
Type |
General cargo Wood packaged wood logs grain |
IMO-number |
8904408 |
Call sign |
UCOO |
Flag |
Russian Federation |
Port of registry |
Arkhangelsk |
GT |
2.489 t Suez: 2.565,98 t |
DWT |
Summer: 2.654 t |
NT |
907 t Suez: 1 561,74 t |
Displacement |
Full load: 4.206 t |
Length |
85,20 m overall 79,35 m between perpendiculars |
Breadth |
14,50 m over all |
Draught |
Summer: 5,05 m Ballast: 3,14 m |
Keel to top whip antenna |
32,90 m |
Depth |
6,00 m |
Speed |
12,6 knots |
Built |
1991 |
Date of completion |
27/08/1991 |
Builder |
Osterreichische Schiffswerft Linz Austria |
Yard number |
779 |
Hull material |
Steel |
Hull type |
Double hull |
Bulkheads |
6 |
Continuous decks |
1 |
Main engine |
1x Bryansk 6DKRN 26/98-12 - Combustion engine 2.074 kW at 237 rpm Built: USSR 1990 Builder: Bryansk Engineering Works, JSC |
Propeller |
1x Controllable pitch propeller - 4 blades |
Generators |
3x Main diesel generatorsets each 264 kVA |
Emergency generator |
1x Diesel generatorset 50 kW |
Number of holds |
2 Hold 1: 22,40 x 11,60 x 6,00 m Bale: 1.678 m³ Grain: 1.684 m³ Hold 2: 22,40 x 11,60 x 6,00 m Bale: 1.678 m³ Grain: 1.727 m³ |
Number of hatches |
2 Hatch 1: 18,85 x 10,50 m Hatch 2: 19,25 x 10,50 m |
Cargo hold capacity |
Total: Grain: 3.411 m³ Bale: 3.356 m³ |
Deck space for cargo |
507 m2 |
Max. permitted loads |
Hatch covers: 1,55 t/m² On deck: 3,00 t/m² |
Tank capacities |
Fuel oil: 197 t / 227 m³ Fresh water: 49 t Water ballast: 738 t |
Lifting equipment |
2x Cranes - SWL 5,0 t each |
Crew size |
16 |
Manager |
Northern Shipping Company, Joint-Stock Company JSC NSC Nab. Severnoy Dviny, 36 Arkhangelsk Russia |
Registered owner |
Northern Shipping Company, Joint-Stock Company JSC NSC Nab. Severnoy Dviny, 36 Arkhangelsk Russia |
Latest data adjustment |
30 June 2020 |