Westerschelde 28 March 2020 |
Westerschelde 22/01/12 | Antwerpen 11/07/14 | Vlissingen 07/02/18 | ||
Name |
PANTA RHEI |
Type |
General cargo ship - heavy cargo - Super Saimamax |
IMO-number |
9489522 |
Call sign |
PBRB |
Flag |
The Netherlands |
Port of registry |
Vlissingen |
GT |
2.409 t |
DWT |
3.755 t |
DWCC |
Summer: 3.500 t |
NT |
1.034 t |
Number of 20ft containers |
132 |
Length |
82,50 m overall 80,84 m between perpendiculars |
Breadth |
12,50 m |
Draught |
Summer: 5,46 m |
Air Draft |
13,50 m |
Freeboard |
2.558 mm |
Depth |
8,00 m moulded |
Speed |
11,5 knots |
Built |
2009 |
Lunch date |
06/11/2008 |
Date of completion |
17/04/2009 |
Builder casco |
Shipyard Leda d.o.o. Korcula Croatia |
Builder completion |
Peters Shipyard BV Kampen The Netherlands Yard number: 1015 |
Hull material |
Steel |
Continuous decks |
1 |
Watertight compartments |
4 |
Main engine |
1x Caterpillar 3512 - 4 stroke single acting 9 cylinder combustion engine 1.249 kW / 1.697 bhp at 1.600 rpm Built: 11/2006 Builder: Caterpillar Tractor Company Inc., Peoria (Illinois) - U.S.A. |
Propellers |
1x Controllable pitch propeller - aft at 239 rpm |
Shaft generator |
1x 390 kVA - 312 kW |
Diesel generators |
1x Diesel generatorset 159 kVA - 127 kW - 247 hp |
Bow thruster |
220 kW |
Number of holds |
1 54,60 x 10,30 x 8,15 m |
Total capacity of holds |
4.583 m³ / 162.000 ft³ |
Hold ventilation |
Electrical ventilation 6 air changes per hour basis empty hold Hold is fitted with dehumidifier system |
Number of hatches |
1 54,60 x 10,30 m |
Tank capacities |
MGO: 173,2 m³ Water ballast: 1.982 m³ Fresh water: 26 m³ |
Manager |
Wagenborg Shipping BV Delfzijl The Netherlands |
Operator |
Wagenborg Shipping B.V. |
Owner |
Lars en Angela But Strandwal 67 4386 HG Vlissingen The Netherlands |
Registered owner |
C.V. Scheepvaartonderneming But II The Netherlands |
Renamed |
28/11/2022 Plataanborg The Netherlands, Delfzijl - Call sign: PBRB Registered owner: Wagenborg Shipowners 4 B.V. Manager: Wagenborg Shipping B.V., Delfzijl - The Netherlands |
Latest data adjustment |
20 December 2023 |