Antwerpen 10 January 2014 |
Name |
ESTESUN |
Previous names |
2006 Launch as: Jin Yin Da 5 2006 - 09.2008 Verdana |
Type |
Bulk carrier - Strengthened for heavy cargo |
IMO-number |
9400588 |
Call sign |
3ETK8 |
Flag |
Republic of Panama |
Port of registry |
Panama City |
GT |
7.959 t |
DWT |
Summer: 12.500 t |
NT |
4.516 t |
Length |
135,80 m overall 126,71 m registered |
Breadth |
20,00 m registered |
Draught |
7,75 m |
Forecastle |
9,15 m |
Poop |
20,85 m |
Freeboard |
2.776 mm |
Depth |
10,50 m moulded |
Built |
2006 |
Keel laid |
20.05.2005 |
Launch date |
30.04.2006 |
Date of completion |
05.09.2006 |
Builder |
Dongfang Shipbuilding Group Co., Ltd. |
Yard number |
DF125-1 |
Hull material |
Shipbuilding steel (standard) |
Hull type |
Double bottom |
Watertight bulkheads |
8 |
Continuous decks |
1 |
Main engine |
1x MAK 9M25 - 4 stroke 9 cylinder 255 x 400 mm diesel engine - 2.970 kW at 750 rpm Year of Manufacture: 2005 Manufacturer: Caterpillar Motoren GmbH & Co. KG |
Propellers |
1x Solid propeller - aft at 167 rpm |
Boilers |
1x Steam boiler, oil fired - 7,0 bar Heating Surface: 13,7 m² 1x Steam boiler, exhaust gas heated - 7,0 bar Heating Surface: 90,0 m² Year of manufacture: 2005 Manufacturer: Zhangjiagang Greens Shazhou Boiler Co., Ltd. |
Electric installations |
3x Plants each 400 V - 250 kVA 1x Plant 400 V - 150 kVA |
Generators |
3x Main diesel generatorsets each 250 kVA |
Emergency generator |
1x Diesel generatorset 150 kVA |
Compressed air receivers |
1x Receiver 800 litres - 30,0 bar 1x Receiver 500 litres - 30,0 bar 1x Receiver 149 litres - 10,0 bar |
Anchor equipment |
3x Anchors weight each 4.050 kg Chain length: 522,50 m |
Manager |
Shipfin S.A. |
Registered owner |
Boden Shipping S.A. |
Latest data adjustment |
23 February 2014 |