Westerschelde 19 May 2018 |
Westerschelde 18/08/18 |
Name |
PEAK BERGEN |
Previous names |
10/2010 - 01/2017 Abis Bergen |
Type |
Multi purpose cargo - Heavy cargo open top - Strengthened for Heavy Cargo - Bottom strengthened for unloading aground - Container cargoes in hold and on the poop deck and on all hatch covers |
IMO-number |
9544932 |
Call sign |
PBPY |
Flag |
The Netherlands |
Port of registry |
Harlingen |
GT |
2.978 t registered |
DWT |
Summer: 3.900 t |
NT |
1.384 t |
Displacement |
5.360 t |
Light ship |
1.429 t |
Number of 20ft containers |
214 |
Length |
89,95 m overall 84,95 m between perpendiculars |
Breadth |
14,00 m moulded |
Draught |
Max. summer: 5,35 m Max.: winter: 5,24 m |
Air draft |
30,74 m |
Freeboard |
1.453 mm |
Depth |
6,80 m to main deck |
Speed |
12,0 knots |
Built |
2010 |
Keel laid |
15/05/2008 |
Date of completion |
08/10/2010 |
Builder casco |
Partner Sp.z.o.o. Szczecin Poland Yard number: 104 |
Builder completion |
Shipkits B.V. Harlingen The Netherlands Yard number: HDFS-025 |
Hull material |
Steel |
Movable bulkheads |
2x Standard equipped with 8 separation bulkheads, can ben used as tweendeck each 4,10 x 10,95 m |
Continuous decks |
1 |
Main engine |
1x MaK Caterpillar 8M20C - 4 stroke single acting 8 cylinder 255 x 400 mm combustion engine output 1.500 kW / 2.037 bhp |
Propellers |
1x Controllable pitch propeller aft at 170 rpm - Right handed Diameter: 3.150 mm - 4 blades |
Shaft generator |
1x Stamford 375 kVA |
Generators |
2x Caterpillar C9 - 6 cylinder 112 x 149 mm diesel engine each 192 kW at 1.500 rpm coupled with 2 generators each 250 kVA |
Bow thruster |
1x 300 kW |
Number of holds |
1x Box shaped 56,00 x 11,00 x 8,14 m |
Hold capacity |
Grain: 5.049 m³ / 178.300 ft³ |
Number of hatches |
1 56,00 x 11,00 m |
Max. permitted loads |
Tweendeck: 1,5 t/m Tank top: 15,0 t/m² Hatches + Aft deck: 1,5 t/m² |
Hatch cover type |
Pontoon |
Tank capacities |
Gas oil: 293,0 m³ Lub oil: 12,0 m³ Ballast: 1.640 m³ / 25 tanks Fresh water: 43,4 m³ Dirty oil: 5,3 m³ Bilge water: 5,4 m³ |
Anchor equipment |
2 Weight: 1.440 kg each Length: 220,00 m |
Lifting equipment |
1x Gantry crane |
Cargo gear |
Gearless |
Manager |
Peak Project Carriers A.S. Nyborg Norway |
Previous managers |
10/2010 - 01/2017 Abis Shipping Company B.V., 8861 NX Harlingen - The Netherlands |
Operator |
Peak Project Carriers AS Litleaasveien 49 NO-5132 Nyborg Norway |
Registered owner |
General Partner Peak Bergen B.V. NO-5132 Nyborg Norway |
Previous names & owners |
10/2010 - 01/2017 Abis Bergen - Beheermaatschappij Abis Bergen B.V., Harlingen - The Netherlands |
Latest data adjustment |
17 January 2020 |