Westerschelde 20 July 2014 |
Name |
OVERSEAS YOSEMITE |
Type |
Double hull crude and oil products carrier |
IMO-number |
9394959 |
Call sign |
V7QW2 |
Flag |
Republic of the Marshall Islands |
Port of registry |
Majuro |
GT |
62.775 t registered Suez: 64.057,27 t |
DWT |
Summer: 112.905 t |
NT |
34.934 t registered Suez: 58.429,69 t |
Length |
249,96 m overall 240,00 m between perpendiculars |
Breadth |
44,00 m extreme |
Draught |
11,90 m |
Air draft |
Lightship: 47,31 m Normal ballast: 41,50 m At loaded summer deadweight: 35,18 m |
Keel to Masthead |
50,00 m |
Freeboard |
Summer: 6.216 mm Winter: 6.524 mm |
Depth |
21,00 m moulded |
Speed |
11,0 knots |
Built |
2009 |
Keel laid |
20.06.2008 |
Launch date |
18.11.2008 |
Date of completion |
13.04.2009 |
Builder |
New Times Shipbuilding Co., Ltd. |
Yard number |
0311504 |
Hull material |
High strength steel Ordinary strength steel |
Hull type |
Double hull |
Bulkheads |
Water tight: 2 Oil tight: 11 |
Main engine |
1x 7S60MC-C - 7 cylinder 600 x 2.400 mm diesel engine - 15.820 kW at 105,0 rpm Manufacturer: Doosan Engine Co., Ltd. |
Propellers |
1 Manufacturer: Wärtsilä CME Zhenjiang Proppller Co,. Ltd |
Boilers |
1x Exhaust gas boiler - Mission XS-2V, No177831 2x Auxiliary oil fired boiler - Mission TM OL 25T/H Manufacturer: Aalborg Industries Ltd. |
Generators |
2x Taiyo generators 553B-10 each 900 kW 1x Taiyo generator FE553B-10 - 900 kW Manufacturer: TAIYO Electric Co.,LTD |
Number of cargo tanks |
15 |
Cargo oil capacity 98% |
Seg#1: 16.571,6 m³ (No 1 cargo tank) Total: 124.646,7 m³ excluding slop tanks |
Slop tanks 98% |
2.759,6 m³ |
Pumping systems |
Cargo pumps: 2x Type centrifugal (vertical) each 3.000 m³/h Ballast pump: 2x Centrifugal each 2.000 m³/h |
Manifolds |
Bow to centre manifold: 123,52 m Stern to centre manifold: 126,65 m Distance bridge front to centre of manifold: 84,59 m Distance between cargo manifold centres: 2.500 mm Distance ships rail to manifold: 4.450 mm Distance manifold to ships side: 4.750 mm Top of rail to centre of manifold: 4.450 mm Distance main deck to centre of manifold: 2.100 mm |
Number of tanks |
Ballast: 14 Fuel oil: 9 Lubricating oil: 8 Diesel oil: 4 Fresh water: 4 Sludge: 3 Chain: 2 |
Tank capacities |
Diesel Oil: 248,8 m³ / 211,48 t Freshwater: 520 m³ Lube Oil: 230 m³ / 207 t Tank Ballast: 40.967,5 m³ / 41.991,68 t |
Lifting equipment |
1x Engine room overhead crane - SWL 5,0 t Manufacture: Bolin Engineer & Machinery Co.,Ltd. 2x Hose handing crane - SWL 15,0 t Manufacture: Dalian Shidao Marine Fitting Co., Ltd. 2x Provision crane - SWL 5,0 t Manufacture: Jiangsu Bolin Engineering & Machinery Co., Ltd. 1x Pump room pneumatic davit - SWL 1,5 t Manufacture: Bolin Engineer & Machinery Co.,Ltd. |
Manager |
Epsilon Aframax Corporation C/O The Trust Company Of The Marshall Islands Trust Company Complex Ajeltake Island, Ajeltake Road Majuro Marshall Islands |
Commercial operator |
Heidmar Inc. |
Technical operator |
V Ships UK Ltd. |
Registered owner |
Epsilon Aframax Corporation |
Latest data adjustment |
11 August 2014 |