Westerschelde 19 December 2017 |
Name |
WOLGASTERN |
Type |
Oil and chemical carrier |
IMO-number |
9183817 |
Call sign |
CQLH |
Flag |
Portugal |
Port of registry |
Madeira |
GT |
14.400 t registered |
DWT |
Summer: 21.823 t |
NT |
6.937 t registered |
Length |
162,16 m overall 155,00 m between perpendiculars |
Breadth |
27,18 m moulded |
Draught |
8,82 m |
Freeboard |
3.214 mm |
Depth |
12,00 m moulder |
Speed |
15,0 knots |
Built |
1999 |
Keel laid |
22/06/1999 |
Delivery date |
30/12/1999 |
Builder |
Stocznia Gdynia S.A. Gdynia |
Yard number |
8189/1 |
Hull material |
High strength steel |
Hull type |
Double hull |
Watertight bulkheads |
15 |
Main engine |
1x MAN/Cegielski 6S45 MC-C - 6 cylinder 450 x 2.000 mm diesel engine 7.860 kW at 129,0 rpm Manufacturer: H. Cegielski Poznan SA - Poland |
Boilers |
1x Auxiliary boiler - 10,0 bar 1x Composite boiler - 10,0 bar manufacturer: Aalborg |
Shaft generator |
1x 900 kW |
Generators |
3x main diesel generatorsets each 830 kW |
Number of cargo tanks |
15 |
Cargo tank capacity |
24.459,8 m³ - 100% 23.832 m³ - 98% |
Number of tanks |
Ballast: 16 Sludge: 13 Fuel oil: 8 Lubricating oil: 5 Diesel oil: 4 Fresh water: 4 Chain: 2 |
Tank capacities 100% |
Diesel Oil: 145 m³ / 130,5 t Freshwater: 420,9 m³ Fuel Oil: 1.276,3 m³ / 1.250,77 t Lube Oil: 63,6 m³ / 57,24 t Tank Ballast: 9.542 m³ / 9.780,55 t |
Lifting equipment |
1x Hose handling crane - SWL 10,0 t 1x Provision/free fall lifeboat recovery crane - SWL 4,0 t |
Operator |
TB Marine Shipmanagement GmbH & Co. KG |
Registered owner |
MT Wolgastern Schifffahrtsgesellschaft mbH & Co. KG |
Latest data adjustment |
14 February 2017 |