Spijkenisse, The Netherlnands 02 September 2014 |
Name |
EDDY 1 |
Type |
Escort tug |
IMO-number |
9714575 |
Call sign |
PCMS |
Flag |
The Netherlands |
Port of registry |
Rotterdam |
GT |
399 t |
NT |
119 t |
Length |
30,30 m overall 28,95 m between perpendiculars |
Breadth |
13,46 m overall 12,43 m beam |
Draught |
4,75 m |
Freeboard |
1.640 m |
Depth |
7,91 m |
Speed |
Max.: 14,0 knots Service: 11,0 knots |
Built |
2014 |
Keel laid |
2013 |
Launch date |
05.05.2014 |
Date of completion |
11.06.2014 |
Builder |
Holland Shipyards The Netherlands |
Yard number |
S2012082 |
Hull material |
Steel |
Continuous decks |
1 |
Main engine |
2x Mitsubishi S16R-C2MPTK - 4 stroke single acting 16 cylinder 170 x 180 mm diesel engines - each 1.397 kW / 1.899 hp total 2.794 kW / 3.798 hp at 1.600 rpm Starter type: Electrical starter Built: 2013 Builder: Mitsubishi Heavy Industries Ltd - Japan |
Propellers |
2x Schottel SRP-3000 Azimuth propellers - aft at 272 rpm 4 blades - Diameter: 2.400 mm |
Electric installations |
400/230 V - 50 Hz |
Generators |
2x Scania DI-16 - 8 cylinder 127 x 154 mm diesel engines at 1.500 rpm coupled with Stamford generators each 725 kVA - 580 kW - 810 hp |
Emergency generator |
1x Sisu 49CTAG - 4 cylinder 108 x 134 mm diesel engine at 1.500 rpm coupled with Stamford generator 112 kVA - 90 kW |
Bollard pull |
65 t |
Towing equipment aft |
1x Kraaijeveld double drum safe winch Brake holding power: 175 t Pull aft: 30 t Pulling speed: 9,00 m/min |
Tank capacities |
Fuel oil: 80 m³ Potable Water: 30 m³ |
Navigation & communications |
2x JRC JMA-5312-6 Radars |
Manager |
Holland Shipyards BV The Netherlands |
Latest data adjustment |
10 December 2014 |