Westerschelde 28 August 2018 |
Vlissingen 21/09/18 | |
Name |
A.H. LIGURIA |
Type |
AHTS - Anchor handling tug supply |
IMO-number |
9381495 |
Call sign |
PU6501 |
Flag |
Brazil |
Previous flags |
2008 - 2021 Italy, Genova - Call sign: ICIT |
GT |
2.899 t |
DWT |
Summer: 3.013 t |
Length |
76,25 m overall |
Breadth |
17,50 m moulded |
Draught |
Max: 6,85 m |
Speed |
Max: 16,3 knots |
Built |
2008 |
Date of completion |
05/2008 |
Builder |
Fincantieri Cantieri Navali Italiani S.P.A. - Riva Trigoso Yard Italy |
Yard number |
6152 |
Hull material |
Steel |
Continuous decks |
1 |
Main engine |
4x MaK 6CBM 2C- 4 stroke single acting 6 cylinder 320 x 480 mm combustion engines each 2.950 kW / 3.950 hp at 600 rpm Total 11.800 kW / 115.800 bhp Builder: Caterpillar Motoren GmbH & Co. KG - Germany |
Rudder |
2x Independent RRM High flap rudders |
Propellers |
2x Controllable pitch propeller diameter 3.900 mm in fixed nozzles at 150 rpm 4 Blades |
Propulsion |
1x Tunnel thruster forward 883 kW / 1.201 bhp 1x Azimuthal thruster forward 883 kW / 1.201 bhp 1x Tunnel thruster aft 883 kW / 1.201 bhp |
Shaft generator |
2x 2.240 kW each |
Generators |
2x Main diesel generatorsets each 480 kW / 440 Volt 60 Hz |
Emergency generator |
1x Diesel generatorset 120 kW |
Bollard pull |
180 t |
AHT Winch |
One winch of Ulstein Brattvaag Waterfall type: BSL 400W/SL400W |
Towing |
1x Declutchable drum - 1.300 mm x 3.200 mm diameter Brake holding on first layer - 550 t |
Anchor handling |
1x Declutchable drum - 1.300 mm x 3.200 mm diameter Brake holding on first layer - 550 t 1x Non-declutchable cable lifter for 3 “ chain on each side |
Spooling gear |
No.1 Brattvaag mech/remote contr. Spooling gear for 4.600 long drum on AH/Towing winch No.1 Spooling gear on Towing winch |
Speed 1st step (all 3 drums) |
420 t stalling pull 1. layer: 400 t at 0 - 13,8 m/min Mid. layer: 243 t at 0 - 22,7 m/min Top layer: 167 t at 0 - 30,0 m/min |
Speed 2nd step |
224 stalling pull 1. layer: 214 t at 0 - 20,9 m/min Mid. layer: 130 t at 0 - 34,4 m/min Top layer: 89 t at 0 -50,1 m/min |
Speed 3rd step |
87 t stalling pull 1. layer: 83 t at 0 - 39,1 m/min Mid. layer: 50 t at 0 - 64,2 m/min Top layer: 34 t at 0 - 93,6 m/min. |
Spare/storage capacity |
1x Rope reel winch 10,0 t pull at 0-31m/min min. 1.500 m of 76 mm wire. located below deck |
Secondary winch |
|
Tugger |
4x Tanks capacity total 488 m³ |
Capstan |
2x 15 t |
Towing pins |
2x 10 t |
Quarter pins |
2x Set hydraulic pins - SWL 330 t 2x Hydraulic ‘Pop-up pins’ SWL 60 t |
Forks |
Diameter of 350 mm length 700 mm |
Stern roller |
2x Hydraulic forks - SWL 650 t |
Dry bulk / discharging capacity |
Dry bulk: 4 tanks Capacity: 220 m³ Compressor: 2x 25 m³-min at 80 psi |
Fire fighting equipment |
Monitors: 3x Water monitors 2.400 m³/h Capacity: 3.600 m³ /h at 16 bar at 1.530 rpm Pumps: 2x Fire fighting pumps (Kvaener Eureka) |
Deck |
Deck area: 598 m² / 41,00 x 14,630 m Cargo capacity: 1.000 t Deck strength: 10 t/m² Cargo rail: height of cargo 2,00 m |
Oil recovery |
Approx.: 1.050 m³ |
Liquid and cargo capacity / discharge rates |
|
Lifting equipment |
Deck crane: 1x Crane - SWL 5,0 t at 18,00 m / 8,3 t at 9,30 m 1x Crane - SWL 3,0 t at 12,00 m (aft port side) |
Accommodation |
2x Suites with separate bedrooms and private toilet 1x Hospital with two beds Total persons: 29 |
Navigation and communication equipment |
Joystick control Autopilot Anschutz Pilostar D 2x Gyrocompass Anschutz St-20 1x Radar Jrc X Band 1x Radar Jrc S Band 2x Dgps Jrc 1x Navtex Jrc 2x Inmarsat-C Jrc 1x Weatherfax Jrc 2x Vhf/Dsc Jrc 1x Ais Jrc, 1 Mh/Hf/ Jrc 1x Magnetic Compass Liley Gillie 1x Computerized Dynamic Positioning DP 2 (Kongsberg Simrad) |
Manager |
Finarge Armamento Genovese Srl Via Al Ponte Reale, 2 16123 Genova GE Italy |
Operator |
Rimorchiatori Riuniti |
Registered owner |
Finarge Armamento Genovese Srl |
Latest data adjustment |
23 April 2023 |