Westerschelde 11 October 2015 |
Name |
GARGANO |
Type |
Platform supply/ROV support vessel - UT 755-L Drilling unit |
IMO-number |
9249403 |
Call sign |
VSMW5 |
Flag |
United Kingdom |
Port of registry |
London |
GT |
2.244 t |
DWT |
3.115 t |
NT |
936 t |
Length |
72,00 m overall 66,80 m between perpendiculars |
Breadth |
16,03 m extreme |
Draught |
Max: 5,84 m |
Depth |
7,00 m moulded |
Speed |
Max: 12,5 knots |
Built |
2002 |
Keel laid |
27/02/2001 |
Launch date |
27/07/2001 |
Date of completion |
18/01/2002 |
Builder casco |
Aker Tulcea SA |
Builder completion |
Brattvaag Skipsverft AS |
Yard number |
82 |
Hull material |
Steel |
Bulkheads |
Transverse: 4 Longitudinal: 2 |
Main engine |
2x Rolls-Royce KR-9 combustion engines each 2.725 bhp total 5.450 bhp |
Propellers |
2x Controllable pitch propeller Manufacturer: Rolls-Royce Marine AS |
Generators |
2x Caterpillar 3406 main diesel generator sets |
Emergency generator |
1x Cummins 4B(T)3.9-D(M) diesel generatorset |
Bow thruster |
1x 800 bhp, bow 1x 1.000 bhp, azimuth 2x 800 bhp, stern |
Tugger winch |
1x 10,0 t |
Capstans |
2x 8,0 t |
Deck area |
638 m² |
Deck load |
1.500 t |
Dynamic Positioning System (Class II) |
Kongsberg Simrad SDP 21, 2 x DPC 11 controller unit 1x HiPAP acoustic reference system 1x DGPS reference system 1x Mk 12 Light Weight Taut Wire reference system Interfaces fitted for 410/LBL, Fan Beam Laser Survey Room on main deck fully fitted 19” racks, 220 V power Telemetry and video cables from bridge Main deck power supplies 2x 440 V Main deck aft reinforced to take 150 tonne “A” frame Moon pool on CL of vessel 4,35 x 3,8 m passively stabilised Survey tube to port of Moon pool 0,5 m clear hole, C/W survey pole which protrudes at up to 4,0 m below the hull Spare 14” gate valve fitted, port side of shell opposite HiPAP ready for fitting with a second Gantry and pole system 1x SPT 331 Transponder beacon 2x RPT 316 RT Transponder beacon |
Discharge rates |
Fuel: 200 m³/h Oil based mud: 75 m³/h Base oil: 150 m³/h Brine: 75 m³/h Cement: 80 t/h Barytes: 60 t/h Bentonite: 100 t/h Drill water: 150 m³/h |
Tank capacities 100 % |
Fuel oil: 919,8 m³ Potable water: 705 m³ Drill water: 1.153 m³ Oil based mud: 4.860 bbls Base oil: 1.323 bbls Brine: 4.860 bbls Dry bulk: 9.000 ft³ Ballast: 1.152,4 m³ |
Anchor equipment |
Length: 467,50 m Diameter: 38 mm |
Lifting equipment |
1x Deck crane - SWL 5,0 t @ 10,00 m |
Accommodation |
14x 1 Man 12x 2 Man |
Navigation & communication equipment |
1x Furuno 10CM ARPA RADAR 2835S 1x Furuno 3CM RADAR, Model 2115 1x Furuno Satellite Navigator GP 31 1x Jotron EPIRB 2 x Jotron 9GHz Radar transponder 3x Navico SRH 150 VHF GMDSS 4x Motorola GP 900 portable UHF 1x GSM Cellular phone 3x Anschutz gyro compass - 20 compact 1x Anschutz digital autopilot 1x Anschultz universal signal unit 1x Furuno echo sounder FE-700 1x Furuno Doppler speed log DS80 2x Windserver 11 wind indicator 1x Furuno MF/HF SSB Radio station 1x Furuno DSC terminal DSC 60 2x Thrane & Thrane SAT C 1x Furuno SAT B FELCOM 81 1x Furuno Navtex receiver NX-500 2x Sailor Compact VHF RT 4722 D 1x Sailor RT 2048 simplex VHF |
Manager |
GulfMark UK Ltd. |
Registered owner |
Portosalvo Ltd. |
Latest data adjustment |
19 January 2019 |