Westerschelde 21 May 2015 |
Name |
ABIS CADIZ |
Type |
General dry cargo ship - heavycargo |
IMO-number |
9547324 |
Call sign |
PBNO |
Flag |
The Netherlands |
Port of registry |
Harlingen |
GT |
4.255 t |
DWT |
6.050 t |
NT |
2.341 t |
Number of 20ft containers |
256 |
Length |
114,40 m overall 108,32 m between perpendiculars |
Breadth |
14,40 m moulded |
Draught |
Max: 6,04 m |
Freeboard |
2.068 mm |
Depth |
8,10 m moulded |
Speed |
13,0 knots |
Launch date |
01/09/2009 |
Delivery date |
18/11/2010 |
Builder |
Hangzhou Dongfeng Shipbuilding Company Ltd., Hangzhou China |
Yard number |
HDFS2008-01 |
Hull material |
Steel |
Continuous decks |
1 |
Main engine |
1x Bergen Diesel C25:33 L9P - 4 stroke single acting 9 cylinder 250 x 330 mm combustion engine output 2.610 kW / 3.546 hp at 900 rpm Build: 02/12/2008 Manufacturer: Rolls-Royce Marine AS, Engines Dept. Bergen, Bergen - - Norway |
Propellers |
1x Controllable pitch propeller - aft at 189 rpm |
Generators |
2x Main diesel generatorsets each 235 kVA - 188 kW - 340 hp |
Emergency generator |
1x Diesel generatorset 120 kVA - 96 kW - 158 hp |
Bow thruster |
1x 350 kW |
Number of holds |
2 Hold 1: 38,23 x 11,70 x 8,98 m Hold 2: 44,48 x 11,70 x 8,98 m |
Cargo hold capacity |
Grain: 8.501 m³ |
Number of hatches |
2 Hatch 1: 38,23 x 11,70 m Hatch 2: 44,48 x 11,70 m |
Hatch cover type |
Pontoon type steel covers |
Tank capacities |
Fuel: 402,4 m³ |
Manager |
Abis Shipping Company B.V. Harlingen The Netherlands |
Registered owner |
Beheermaatschappij Abis Cadiz B.V. Harlingen The Netherlands |
Renamed |
27/12/2016 Longviking The Netherlands, Groningen - Call sign: PBNO Manager: Longship B.V., Groningen - The Netherlands Owner: Longviking B.V., Groningen - The Netherlands |
Latest data adjustment |
25 November 2023 |