Westerschelde 13 March 2012 |
Westerschelde 13/03/12 |
Name |
JOMI |
Previous names |
1991 - 04.2006 Arklow View |
Type |
General cargo ship - Strengthened for heavy cargo |
IMO-number |
9038397 |
Call sign |
C6VK4 |
Flag |
Bahamas |
Port of registry |
Nassau |
GT |
2.827 t |
DWT |
Summer: 4.258 t |
NT |
1.596 t |
Displacement |
5.509 t |
Number of 20ft containers |
In hold: 105 On deck: 68 Total: 173 |
Length |
88,20 m overall 84,93 m registered |
Breadth |
13,60 m registered |
Draught |
Summer: 5,80 m |
Air draft |
3,80 m ballast |
Forecastle |
8,49 m |
Poop |
16,50 m |
Freeboard |
1.920 m |
Depth |
7,70 m moulded |
Speed |
11,0 knots |
Built |
1991 |
Keel laid |
29.01.1991 |
Launch date |
04.08.1991 |
Date of completion |
09.1991 |
Builder |
Schiffswerft Hugo Peters Wewelsfleth Peters & Co. GmbH 25599 Wewelsfleth Federal Republic of Germany |
Yard number |
638 |
Hull material |
Shipbuilding steel (standard) |
Hull type |
Partly double bottom |
Watertight bulkheads |
4 |
Movable bulkhead |
2x Portable bulkhead may be placed in 9 positions for cargo separation |
Continuous decks |
2 |
Main engine |
1x Mak 8M332 - 4 stroke 8 cylinder 240 x 330 mm diesel engine - 1.300 kW at 750 rpm Year of manufacture: 1991 Manufacturer: Krupp Mak Maschinenbau GmbH Falckensteiner Str. 2 24159 Kiel Federal Republic of Germany |
Propellers |
1x Solid propeller - aft |
Boilers |
Water heater, oil fired - 2,5 bar Year of manufacture: 1991 |
Electric installations |
3x Plants each 400/220 V - 120 kVA 1x Plant 400 V - 31 kVA |
Generators |
3x DAF DK 1160 MG diesel engines each 106 kW coupled with VEM S250-M4 generators each 110 kVA |
Emergency generator |
1x KHD F4L912 diesel engine 31 kW coupled with VEM 225-M4 31 generator 31 kVA |
Compressed air receivers |
2x Receivers each 125 litres - 30,0 bar 1x Receiver 30 litres - 30,0 bar |
Bow thruster |
1x Bow thruster Snijder Hasselt - 220 kW, forward |
Hold capacity |
Grain & bale: 5.665 m³ / 200.046 ft³ |
Hatch type |
MACOR steel piggy back system |
Max. loading |
Tanktop: 11,1 t/m² Hatch top: 1,6 t/m² |
Ventilation |
6x Mechanical ventilation changes per hour in empty hold |
Tank capacities |
Water ballast: 1.827,17 m³ Fuel oil: 95,69 m³ Fresh water: 21,81 m³ Lub oil: 14,80 m³ |
Anchor equipment |
3x Anchors weight each 1.590 kg Chain length: 412,50 m |
Crew size |
8 |
Manager |
Misje Rederi AS 5817 Bergen Norway |
Registered owner |
Misje Bulk AS 5817 Bergen Norway |
Latest data adjustment |
24 may 2014 |