Antwerpen 05 July 2013 |
Westerschelde 17/09/19 |
Name |
TRABZON |
Type |
Bulk carrier - Panamax |
IMO-number |
9595046 |
Call sign |
9HA2783 |
Flag |
Malta |
Port of registry |
Valletta |
GT |
44.635 t |
DWT |
81.660 t |
Length |
229,00 m overall 222,50 m between perpendiculars |
Breadth |
32,30 m |
Draught |
Max.: 15,50 m |
Keel to mast end |
50,40 m |
Depth |
20,20 m |
Speed |
15,5 knots |
Built |
2011 |
Keel laid |
07/07/2011 |
Launch date |
08/09/2011 |
Delivery date |
08/11/2011 |
Builder |
Hyundai Mipo Dockyard Ulsan South Korea |
Yard number |
6066 |
Hull material |
Steel |
Hull type |
Single hull |
Watertight bulkheads |
9 |
Watertight compartments |
15 |
Continuous decks |
1 |
Main engine |
1x MAN-B&W 6S60MC-C8 - 2 stroke 6 cylinders 600 x 2.400 mm combustion engine 11.360 kW at 92,0 rpm Builder: Hyundai Engine & Machinery Co., Ltd. (B&W), Ulsan - South Korea |
Propellers |
1x Fixed pitch propeller - aft at 92,0 rpm |
Boilers |
1x CHM Kangrim 25,00 m² - 7,0 bar |
Generators |
3x Main diesel generatorsets each 875 kVA - 700 kW - 1.019 hp |
Emergency generator |
1x Diesel generatorset 150 kVA - 120 kW - 190 hp |
Number of holds |
7 |
Cargo hold capacity |
Bale: 90.399 m³ Grain: 95.700 m³ |
Number of hatches |
7 Hatch 1 - 7 : 17,40 x 15,00 m each |
Hatch type |
Mc Gregor side rolling |
Tank capacities |
Fuel oil: 2.906,60 m³ Fresh water: 326 m³ Water ballast: 23.299,90 m³ |
Crew size |
22 |
ISM & commerical manager |
Ciner Shipmanagement AS Mithat Ulu Unlu Sokak 3, Esentepe Mah, Sisli 34394 Istanbul Turkey |
Registered owner |
Trabzon Maritime Ltd. Care of Ciner Gemi Acente Isletmeleri Sanayi ve Ticaret AS (Ciner Ship Management), Mithat Ulu Unlu Sokak 3, Esentepe Mah, Sisli 34394 Istanbul Turkey |
Latest data adjustment |
03 August 2022 |