Westerschelde 08 June 2017 |
Name |
LIA |
Type |
Crude oil tanker |
IMO-number |
9417751 |
Call sign |
A8PL6 |
Flag |
Liberia |
Port of registry |
Monrovia |
GT |
42.010 t Suez: 44.158,23 t |
DWT |
73.723 t |
NT |
22.259 t Suez: 39.780,15 t Panama: 34.705 t |
Displacement |
89.187 t |
Length |
228,60 m overall 219,70 m between perpendiculars |
Breadth |
32,26 m moulded |
Draught |
Summer: 14,48 m |
Freeboard |
6.335 mm |
Depth |
20,80 m moulded |
Speed |
Max: 14,6 knots |
Build |
2008 |
Keel laid |
18/10/2007 |
Launch date |
03/09/2008 |
Delivery date |
03/12/2008 |
Builder |
New Times Shipbuilding Co., Ltd. Dan Hua Gang Port, Jingjiang, 214518 China |
Yard number |
0307347 |
Hull material |
Steel |
Hull type |
Double hull |
Main engine |
1x Hudong/MAN-B&W 5S60MCC - 5 cylinder 600 x 2.400 mm combustion engine Mcr 11.300 kW at 105,0 rpm Manufacturer: Hudong Heavy Machinery Co., Ltd. |
Propellers |
1 |
Boilers |
2x Auxiliary fired boiler Mission TM OL 20 T/H - 18,0 MPa 1x Composite boiler MISSION OC - 10,0 MPa |
Generators |
3x Main diesel generatorsets each 900 kW Manufacturer: Taiyo Electric Co,.Ltd. |
Cargo tank capacity |
86.250,91 m³ |
Tank capacities |
Fuel oil: 2.153,89 m³ Lub oil: 142,13 m³ Fresh water: 696,14 m³ Ballast: 27.226,86 m³ Diesel oil: 287,60 m³ |
Lifting equipment |
1x Engine room overhead crane - SWL 4,5 t 1x Hose handling crane - SWL 15,0 t 1x Provision crane - SWL 5,0 t |
Manager |
Marwave Shipmanagement Wamberg 35 1083 CW Amsterdam The Netherlands |
Registered owner |
Pintail BV Monrovia Liberia |
Latest data adjustment |
24 October 2024 |