Westerschelde 18 September 2019 |
Westerschelde 18/09/19 | Westerschelde 21/04/15 | Westerschelde 21/04/15 | Antwerpen 27/08/14 | Antwerpen27/08/14 | Westerschelde 14/12/19 | |||||
Westerschelde 10/03/18 | ||||||||||
Name |
CAPEWATER |
Type |
Chemical/Oil products tanker |
IMO-number |
9423841 |
Call sign |
PBPQ |
Flag |
The Netherlands |
Port of registry |
Rotterdam |
GT |
3.374 t |
DWT |
Summer: 5.180,38 t |
NT |
1.501 t |
Displacement |
Summer: 7.480,38 t |
Light ship |
2.300 t |
Length |
99,98 m overall 96,79 m between perpendiculars |
Breadth |
16,05 m extreme |
Draught |
Summer: 6,73 m |
Max. height |
36,00 m from base line |
Keel to mast end |
32,50 m |
Fore ship to bridge |
78,32 m |
Aft ship to bridge |
21,65 m |
Depth |
8,20 m moulded |
Speed |
14,5 knots loaded |
Built |
2009 |
Keel laid |
16/09/2007 |
Launch date |
01/06/2007 |
Date of completion |
30/01/2009 |
Builder casco |
Eregli Gemi Insa Sanayi ve Ticaret AS Karadeniz Eregli Turkey |
Builder |
Machinefabriek Breko Shipbuilding & Repair B.V. Papendrecht The Netherlands |
Yard number |
0576 |
Hull material |
Steel |
Hull type |
Double hull |
Continuous decks |
1 |
Main engine |
1x Wärtsilä 6L38 - 4 stroke 6 cylinder 475 x 390 mm combustion engine 3.501 kW / 4.760 hp at 600 rpm |
Propellers |
1x Controllable pitch propeller Diameter 4,36 m |
Generators |
3x MAN D2876LXE301 diesel engine each connected with Stamford HCM 534 F generator 463 kVA |
Emergency generator |
1x Cummins 6BT 5.9 diesel engine connected with Stamford UCM 274 E generator 120 kVA |
Bow thruster |
1x Controllable pitch propeller 440 kW / 590 hp |
Number of cargo tanks |
12x Marineline coating - 2 slop tanks |
Cargo tank capacity |
100%: 5.918,310 m³ 98%: 5.799,995 m³ 95%: 5.622,398 m³ |
Slop tank |
95,66 m³ |
Number of pumps |
12x Cargo pumps each 180 m³/h |
Manifolds |
Fore ship to manifold: 42,33 m Aft ship to manifold: 57,65 m Bridge to manifold: 36,00 m Manifold to main rail P&S: 2,50 m Manifold to waterline in ballast: 5,30 m Manifold to waterline in loaded condition: 3,95 m Manifold to main deck: 2,45 m Distance bow to mid-point manifold: 43,00 m Distance stern to mid-point manifold: 56,98 m |
Ballast tank |
2.273,94 m³ |
Commercial manager |
GEFO Raboisen 5 20095 Hamburg Germany |
ISM manager |
Clearwater Ship Management BV Scheepvaartweg 9 3356 LL Papendrecht The Netherlands |
Operator |
Clearwater Group |
Owner |
Capewater C.V Dockworks I,1st Floor Waalhaven Oostzijde 83B 3087 BM Rotterdam The Netherlands |
Latest data adjustment |
02 August 2022 |