Westerschelde 13 November 2017 |
Antwerpen 22 May 2015 |
Name |
UACC IBN AL HAITHAM |
Type |
Crude oil tanker |
IMO-number |
9485631 |
Call sign |
9HVB9 |
Flag |
Malta |
Port of registry |
Valletta |
GT |
42.010 t Suez: 44.158,23 t |
DWT |
Summer: 73.338 t |
NT |
22.361 t Suez: 43.454,91 t Panama: 34.705 t |
Length |
228,60 m overall 219,70 m between perpendiculars |
Breadth |
32,26 m extreme |
Draught |
14,48 m |
Keel to masthead |
49,30 m |
Air draft |
Lightship: 46,25 m Normal ballast: 42,09 m Summer deadweight: 34,80 m |
Freeboard |
Summer: 6.135 mm Winter: 6.437 mm Tropical: 5.833 mm |
Depth |
20,48 m moulded |
Speed |
14,7 knots |
Built |
2009 |
Builder |
New Times Shipbuilding |
Yard number |
0307349 |
Hull material |
Steel |
Hull type |
Double hull |
Main engine |
1x MAN-B&W-Hudong Heavy Machinery 5S60MC-C - 2 stroke 5 cylinder diesel engine 11.300 kW |
Propellers |
1x Fixed pitch propeller |
Generators |
3x Main diesel generatorsets each 900 kW |
Number of tanks |
12 |
Total cargo capacity 98% |
81.285,8 m³ excluding slop tanks |
Number of slop tanks |
2 |
Total slop tank capacity 98% |
2.831,1 m³ |
Residual/Retention oil tank 98% |
319,02 m³ |
Segregation |
3 |
Coating |
Epoxy |
Pumps |
Cargo pumps: 3x Centrifugal cargo pumps each 2.300 m³/h 1x Reciprocating stripping pump 250 m³/h 2x Centrifugal ballast pumps each 1.500 m³/h |
Manifolds |
Bow to centre manifold: 114,80 m Stern to centre manifold: 113,86 m Distance bridge front to centre of manifold: 75,26 m Distance between cargo manifold centres: 2.500 mm Distance ships rail to manifold: 4.800 mm Distance manifold to ships side: 4.800 mm Top of rail to centre of manifold: 1.900 mm |
Lifting equipment |
1x Crane - SWL 15,0 t |
Manager |
United Arab Chemical Carriers |
Commercial operator |
Dampskibsselskabet 'Norden' A/S |
Technical operator |
Fleet Management Ltd. |
Registered owner |
United Arab Chemical Carriers Ltd |
Latest data adjustment |
27 June 2015 |