Westerschelde 03 August 2017 |
Westerschelde 02/08/17 | |
Name |
NOR DA VINCI |
Previous names |
2011 - 2012 Gulmar Da Vinci 2012 - 2013 Iremis Da Vinci 2013 - 2016 Harkand Da Vinci |
Type |
Offshore support vessel - Diving support vessel - Crane operation - Supply operations - Fire fighting |
IMO-number |
9441233 |
Flag |
Marshall Islands |
Port of registry |
Majuro |
GT |
8.691 |
DWT |
5.662 t |
NT |
2.608 |
Displacement |
12.565 t |
Length |
115,40 m overall 107,40 m between perpendiculars |
Breadth |
22,20 m |
Draught |
Summer: 7,03 m |
Depth |
9,00 m to main deck 11,80 to shelter deck |
Speed |
14,0 knots |
Build |
2011 |
Keel laid |
09/02/2009 |
Launch date |
23/08/2009 |
Date of completion |
28/06/2011 |
Builder |
Hanjin Heavy Industries & Construction Co., Ltd. Pusan South Korea |
Yard number |
S068 |
Hull material |
Steel |
Propulsion |
Diesel/Electric |
Main generators |
3x MAN-B&W 8L27/38 main diesel generatorsets each 2.510 ekW at 720 rpm / 690 Volt/60Hz 2x MAN- B&W 6L27/38 main diesel generatorsets each 1.880 ekW at 720 rpm / 690 Volt/60Hz |
Auxiliary generators |
2x MAN-B&W 8L27/38 diesel generatorsets each 835 ekW at 1.200 rpm / 690 Volt/60Hz |
Emergency generator |
1x Caterpillar 3508B diesel generatorsets 910 ekW at 1.800 rpm |
Thruster |
Bow thrusters: 2x Wärtsilä tunnel thrusters each 1.900 kW Bow azimuth: 1x Wärtsilä retractable thruster 1.500 kW Stern thrusters: 2x Wärtsilä azimuth thrusters each 3.000 kW |
Deck load capacity |
3.300 t |
Deck surface |
Main deck: 1.120 m² Forecastle deck: 235 m² |
Max permitted loads |
Main deck: 10,0 t/m² Forecastle deck: 6,5 t/m² |
Tank capacities |
Fuel oil: 1.440 m³ Lub oil: 53,0 m³ Potable water: 1.160 m³ + 40 m3/day water makers Ballast: 5.122,5 m³ Anti-heeling: 940 m³ |
Anchor equipment |
Length: 550,00 m Diameter: 54 mm |
Cargo gear |
1x TTS Marine type CCLKO 1600-140-35 main Crane - SWL 140,0 t 1x TTS Marine type CCLO 1250-40-27 - SWL 40,0 t |
Accommodation |
For 120 persons 23 x 1-man cabins 46 x 2-men cabins 2 x (2+2)-men cabin (Pullman) 123 beds in total mess rooms, control rooms and offices Hospital: 4 beds |
Navigation equipment |
Radar plant:
Navigation/Direction finder:
Gyro plant/Autopilot:
Compass:
Echo sounder a speed log:
Positioning:
|
Communication equipment |
GMDSS A3 Radio Station
VHF & UHF
Digital communication:
Navigation / Video Screen:
CCTV System:
|
Manager |
Nor Offshore SPV Ltd. & Anglo-Eastern (UK) |
Owner |
Nor Offshore Da Vinci SPV Ltd. |
Previous names & owners |
2011 - 2012 Gulmar Da Vinci - Gulmar Da Vinci Marine Investment S.A. 2012 - 2013 Iremis Da Vinci - Iremis Da Vinci Marine Inc. 2013 - 2016 Harkand Da Vinci - Harkand Da Vinci Inc. |
Renamed |
21/05/2019 Boka Da Vinci Marshall Islands, Majuro - Call sign: V7SG4 Owner: Boskalis Subsea North Star Limited Manager: Boskalis Subsea Services Limited |
Latest data adjustment |
10 December 2024 |